Manufacturing and preparation of solar equipment

A solid foundation based on experience.

Manufacturing and preparation

Solar equipment

At Suntech Energy, we go beyond the simple supply of solar equipment. Our team is actively participating in the development of energy solutions and the manufacture of specialized components, including the pre-assembly of equipment in the workshop to optimize the quality, the reliability and speed of installation in the field.

The manufacturing and pre-assembly of equipment is part of a comprehensive approach where Suntech Energy supports its customers at every step :

This integrated approach allows us to offer solar projects better planned, more effective and better adapted to the needs of customers.

Development of products and energy solutions

Suntech Energy contributes to the development of solutions adapted to the realities of the energy market modern. Our expertise allows us to develop and customize equipment to meet the specific needs of each project.

We are working on :

This approach allows us to offer solutions reliable, scalable and adapted to the demanding environments.

Pre-assembly of solar equipment in the workshop

In order to ensure a quick and efficient on the ground, several components are assembled and prepared directly in our workshop.

The pre-assembly allows :

Each component is prepared with precision to ensure a fast and safe once it's on the site of the project.

The work done in the workshop allows our team to check each component before installation. This step ensures that the systems delivered to meet the standards of performance and reliability expected.

Thanks to this preparation upstream, the facilities are more efficient and the projects can be made in a time optimized.

Need a solar solution fit to your project?

Contact our team to discuss your requirements and discover the sets solar, best suited to your situation.

Request for solar estimate

Complete this form to receive a preliminary recommendation based on your situation.

Étape 1

Step 1 — Your goal

Step 2 — Connection and ownership

Generally, only the property owner can proceed with a project eligible for net measurement. However, you can leave your contact information at the end if you would like us to get in touch.

Step 3 — Building

Step 4 — Consumption

Step 5 — Site and roof

If installed on the roof: maximum 16 panels (10 kW).
Note: Installation is generally preferred on surfaces well oriented towards the south, southeast or southwest, with a minimum of shade.

Step 6 — Breakdowns, budget and priority

Step 7 — Preliminary Result

System type To be determined
Suggested power To be determined
Estimated production To be determined
Battery To be determined
Estimated budget To be determined

Step 8 — Your contact details